Roofing work in Miami-Dade County does not arrive at an even pace. This analysis uses recorded permits in Poach.rr's dataset, collected from public permit portals, across a 24-month series ending September 2026. It does not cover every permit in the county, but it shows the shape of demand well enough to plan around.
The trailing 12 months at a glance
Over the trailing 12 months, our dataset holds 9,683 roofing permits, against 9,754 in the prior 12. That is a trailing change of -0.7%, so the year as a whole is essentially flat. The monthly average is 807. The month-to-month swings are much larger than the year-to-year change.
| Month | Roofing permits |
|---|---|
| October 2025 | 849 |
| November 2025 | 608 |
| December 2025 | 662 |
| January 2026 | 638 |
| February 2026 | 585 |
| March 2026 | 671 |
| April 2026 | 758 |
| May 2026 | 650 |
| June 2026 | 919 |
| July 2026 | 1,469 |
| August 2026 | 984 |
| September 2026 | 890 |
Peak and low month
The peak month in the trailing 12 is July 2026 at 1,469 permits. The low month is February 2026 at 585. Those two months sit far apart, and the monthly average of 807 falls much closer to the low end than the peak.
July 2026 is also an outlier against the earlier part of the series. July 2025 recorded 822, and no other month in the 24 months comes near 1,469. We cannot see why from permit data alone, so treat July as a spike rather than a reliable annual peak until another year confirms it.
The winter trough
The steadier pattern is the cold-season dip. From November 2025 through March 2026, monthly counts ran between 585 and 671, all below the 807 average. The previous winter was shallower: November 2024 recorded 758, December 2024 712, January 2025 763 and February 2025 736. A softer winter is consistent with seasonality, though the depth of the dip clearly varies from year to year.
Spring and the shoulder months
The prior-year series had its high point in spring: April 2025 recorded 964, then May 910 and June 880. Spring 2026 looked different. April 2026 recorded 758 and May 650, before June jumped to 919 and July to 1,469. Spring was strong in one year and muted in the next, so a roofer who plans only around spring may be caught off guard.
The months above the 807 average in the trailing 12 are October 2025 (849), June 2026 (919), July 2026 (1,469), August 2026 (984) and September 2026 (890).
What about the latest month?
September 2026 recorded 890 permits, down from 984 in August, a change of -9.6%. Against September 2025 (740), it is up 20.3%. The latest month can be incomplete because some portals publish filings late, so do not read the month-over-month drop as a trend. Wait for the October count before drawing conclusions.
How to time crews
- Build your capacity for June through September. The four most recent months in the series all ran above the 807 average. If you add crews or subcontractors, lock them in before June rather than after the surge begins.
- Use November through March for maintenance, training and backlog. Permit filings in those months were at their lowest in the series. Schedule equipment servicing, safety training and estimate follow-ups then.
- Do not hire against one month. July 2026 is a single spike. Staff for the broader June-to-September stretch, not for 1,469.
How to time canvassing and marketing
Permit filings tend to follow demand with some lag, so the quiet winter is a good time to build your pipeline for the busier months. Canvassing and outreach in the trough can fill your calendar before the summer volume arrives.
Roof age gives you a way to pick targets. Of 76,871 homes tracked, 3,447 have roofs aged 15 to 19 years and 4,172 are over 20 years. Another 5,213 sit in the 10-to-14 range. These older roofs are the more natural candidates for a replacement conversation. Most tracked homes have much newer roofs: 31,632 are under five years and 32,407 are between five and 10 years.
Geography matters too. In our dataset, the largest share of roofing permits is filed under the label “Miami-Dade County” (5,715, or 59%). Miami Gardens (1,218), Coral Gables (1,212), Hialeah (805) and Miami Beach (424) follow. A winter canvassing plan could start with the cities where permit volume is already deep.
A quick note on solar
If you also sell solar, the seasonal picture is less clear. The trailing 12 recorded 966 solar permits against 1,194 in the prior 12, a change of -19.1%. September 2026 recorded 64, below the 99 of September 2025. Solar counts do not track the roofing spike in July, so plan them separately.
Using this with Poach.rr
Poach.rr builds prospects from public permit records. Contractors pick a state and county, filter by permit age, and buy a prospect exclusively or shared. Because the data is swept daily, you can build your winter outreach list ahead of the summer rush. New accounts get free prospects to try the marketplace, no card required. Coverage depends on which jurisdictions publish permits.
Frequently asked questions
Which month has the most roofing permits in Miami-Dade County?
In the trailing 12 months, July 2026 was the peak at 1,469 recorded permits in our dataset. It is well above July 2025, which recorded 822, so treat it as a spike until more data confirms a pattern.
Which month is slowest for roofing permits in Miami-Dade?
February 2026 was the low month in the trailing 12, with 585 recorded permits. November 2025 through March 2026 all ran below the 807 monthly average.
Is roofing permit volume in Miami-Dade going up or down?
Overall it is flat. The trailing 12 months recorded 9,683 permits against 9,754 in the prior 12, a change of -0.7%. September 2026 is up 20.3% from September 2025, but the latest month can be incomplete.
When should a roofer start marketing for the busy season?
The data shows counts climbing from April 2026 and moving above the 807 average from June. Outreach in the slower winter months, when counts ran between 585 and 671, can build your pipeline ahead of that.
Did roofing permits really drop in September 2026?
September 2026 recorded 890 permits, down 9.6% from August's 984. Because some portals publish filings late, the latest month can be incomplete, so it is not enough to call a trend.
Methodology
Counts are residential roofing and solar building permits in Poach.rr's dataset for Miami-Dade County, FL, collected from public county and city permit portals. Coverage depends on which jurisdictions publish permits, so read the numbers as a consistent sample, not a census of every permit filed. Months where a source feed was incomplete are excluded from comparisons, and the latest month can rise as portals publish late filings. Data runs through September 2026; page generated October 29, 2026.